您现在的位置是:首页 >

商务英语索赔谈判对话 《商务英语口语900句》Unit 26:索赔理由及依据

火烧 2022-02-11 18:28:37 1061
《商务英语口语900句》U it 26:索赔理由及依据 Part O e wa fou d y the i ectio that there i a differe ce of 35 Kg eee t
商务英语索赔谈判对话 《商务英语口语900句》Unit 26:索赔理由及依据

《商务英语口语900句》Unit 26:索赔理由及依据  

Part One
was found by the inspection that there is a difference of 35 Kg beeen the actual landed weight and the invoiced weight.
752. The landed goods were quite different from what expected.
753. We find the free acidity exceeds the contract maximum by 0.01%
so we have to ask you to indemnify us for a loss of £5
000.
754. The inspection shows that the salt density exceeds at least 4%.
consignment is not up to the standard stipulated in the contract. We are now lodging a claim against you for £2
000.
756. The dried mushroom you sent us are far below the standard stipulated in the contract.
quality of you shipment for our order is not in confomp3ity with the specifications
we must therefore lodge a claim against you for the amount of £280
000.
find the copper wire you supplied is not to the exact specifications of your sample.
customers plain that the goods are much inferior in quality to the samples.
quality of the goods you shipped last week is much interior to that of the goods of our last order.
761. The inspection reveals that both the quantity and quality of the wheat delivered are not in confomp3ity with those stipulated in the contract
though the packing is all in good condition.
of the shirts are of a smaller size. I wonder if you made a mistake when sending the goods.
e are too many defective items in this shipment.
leather shoes you sent us last Friday are not the right size. They should be size 42.
quality of the goods you sent us last week is too poor to suit the requirements of this market.
quality of your shipment for your order No. 346 is far from the agreed specifications.
er inspection by the health officers showed that the canned fruit were considered unfit for human consumption.
loss was due to the use of substandard bags for which you should be responsible.
was found
upon examination
that nearly 20% of the packages had been broken
apparently to faulty packing.
survey report can certify that the weight shortage was caused by improper packing.
Part Two
771. A close inspection and a careful test by the China National Import & Export Commodity Inspection Bureau showed that some amplifiers are inferior quality.
find that the quality
quantity and weight of the goods are not in confomp3ity with those stipulated in this contract after re-inspection by the China Commodity Inspection Bureau
we are now returning the goods to you and lodge claims against you for pensation of losses.
survey has revealed that the damage to the goods is attributable to rough handling.
surveyor’s report indicates that there has been some serious damage to some of the goods.
775. On the basis of clause 15 of the contract
we place our claims before you as follows.
have to put in a claim against you for all the losses sustained.
taking delivery
we found that the cargo had been seriously wet by fresh water and putrefied. You must pensate us for the loss.
require you to replace the damaged goods and grant us a special discount of five percent to pensate for the loss.
rding to the contract
you are responsible to pensate us for the loss we have suffered.
have suffered a loss of 20% on the selling price because of the inferior quality of the products you sent us. You must pensate us for all this.
expense including inspection fee and losses arising from the return of the goods and claims should be borne by you.
must hold responsible for all the losses caused by the delay in delivery of the goods.
should take back all the disqualified goods and pensate us for the value of the goods plus all losses sustained due to return of the cargo
such as freight
storage charges
insurance premium
interest
and inspection charges.
have the right to claim against you for pensation of all losses.
products we received last Monday didn’t agree with the samples and feel that you should make it up.
is the survey report issued by CCIB in support of you claim.
st everyone of the drums was leaking slightly. We must hold you responsible for the loss.
have lost considerable business because of your delay in shipment. We expect pensation from you fro the loss.
request that you make up the short-landed goods covered by our contract No.147 promptly.
regret to infomp3 you that we are pelled to return the disqualified goods at your expense.  
永远跟党走
  • 如果你觉得本站很棒,可以通过扫码支付打赏哦!

    • 微信收款码
    • 支付宝收款码